Skip to content
RESUMOVIAConstruções, Lda
All projects

Building structure in Quarteira

Type
New construction
Location
Quarteira
Year
2024
Photo of the Building structure in Quarteira project

Structure and masonry of a four-storey building, built with a tower crane, and the spray-applied interior plaster.

Reinforced concrete columns and slabs, with the brick infill following right behind the structure.

The tower crane served all four floors and the mixer stayed on site, which meant small pours did not depend on ready-mix deliveries.

  • Spraying plaster into a brick corner
  • The first coat covering the brick
  • Video of the plaster being sprayed and levelled
  • Levelling the plaster near the floor
  • One of our crew preparing the wall for spraying
  • The spraying machine and the bagged mortar
  • The spraying machine with the crew behind
  • The spraying machine on a floor still in shell
  • Brick corridor before plastering
  • Video of plastering the brick walls
  • The plastered corridor, ready for finishing

Want a project like this?

Request a quote
Next projectFaçade rehabilitation in Vila Real de Santo António